Trading Billy at the factory floor

Met the supplier at lunch with a few new faces from the same industry. The new faces are from Beijing, that’s why we had many common topics to discuss. Discussion went well with the supplier in the afternoon and I was pretty excited. Went back to the factory and checked on the products. I was thinking that I just needed to work on 30 of them and it would take around 30 mins. God, finally, with 5 other people help, we spent 5.5 hours to fix everything. As usual, I just skipped dinner, no water, no toilet break until I was done. When I sat down at the restaurant, it was 12:15a.m. Reminded me of the time I had in Dong Guan.

I have been telling my people, it is not possible to have zero issue in a single project, no matter it is a big or small project. The major objective is to minimize the problems and correct them in the shortest timeframe. And more important, we learn from those stupid mistakes and tell ourselves not to do them again the next time.

Nokia phone book backup

Just helped my dad to backup his phone book from his cell to the computer. Still remember how stupid I was when I deleted his entire phone book the last time. He and I were talking about this last instance and we both laughed like crazy. He said, “don’t delete my phone book, please, I have even more phone numbers now!”

System, Process, Workflow

Those are the words I use all the team in the office, actually, I have that in mind in my daily life, too. Without those figured out in advance, it takes much longer to accomplish tasks. Besides, it is much easier to run into problems and mistakes. Will keep pushing my ideas across, it is tough at this early stage, but my life and everyone’s life will be much easier in the near future.